Frog Road

Falcon Design was responsible for the vertical and horizontal design per latest Henry County, AASHTO, and GDOT standards for Frog Road. This project includes a 1.3-mile, 1 triple box culvert (10×12), 2-lane rural ditch section, and 35-45 mph design speed.

The design plan required environmental reports, topographic, and boundary surveys. The following GDOT processes and manuals were used on this project: GDOT Plan Development Process, Design Policy Manual, Environmental Procedures Manual, Driveway & Encroachment Manual.