South Point Boulevard Extension

South Point Boulevard is designed as a two-lane divided median with on-street parking and bike lanes. The Design Plan required environmental reports, topographic and boundary surveys, landscape architecture, as well as horizontal and vertical design to AASHTO requirements.

The following GDOT processes and manuals were used on this project: GDOT Design Policy Manual, Environmental Procedures Manual, Driveway & Encroachment Manual.